SUMMIT
WGLN - SiMErgency I & II:
A Web-based Simulation of Medical Emergencies
for Training High School Students
WGLN.org
 Proposal
 People
 Documents
 Videos & Demos
 Publications
 Images
 Calendar
Videos & Demos

March 17, 2008

The SiMErgency II Final Report [PDF] was submitted. The combined findings of the US and Swedish students show improved performance of CPR after training e.g. increased time effectiveness and a higher degree of adherence to the practiced CPR algorithm. The students reported positive experiences of flow during training. Self-efficacy was high for both groups and increased after training.

September 13-14, 2007

LeRoy Heinrichs gave a presentation at the first Serious Worlds Conference at Conventry University in the UK. The talk was titled, "Serious Virtual Worlds for Biology and Medicine.

June 30, 2007

Parvati Dev spoke at the Slice of Life 2007 held in Salt Lake City, Utah. Her talk was entitled, "Virtual Worlds for Team Learning Using Online Multiplayer Video Game Technology."

Parvati at Slice of Life

Watch Video (Real player required)
Abstract (PDF)
Slice of Life 2007 Schedule

June 1, 2007

The CPR study was conducted with 24 students from Woodside high school. This video highlights the type of CPR skills that are being evaluated.

VEDII

Watch Video

Right-click (Win), or Ctrl-click or click-and-hold (Mac) on the "Download File" links to find command closest to "Save" or "Download" the "Link" or "Target." Save file to your intended local folder.

Here are the results of the questionaire that was completed by over 35 Woodside high school students: Questionnaire Results Spreadsheet [MS Excel file]

May 16-17, 2007

The code triage study is a joint effort between Forterra Systems Inc. and SUMMIT. The study takes place at SUMMIT on May 16-17, 2007. The video below demonstates how the study was performed.

VEDII

Watch Video

Right-click (Win), or Ctrl-click or click-and-hold (Mac) on the "Download File" links to find command closest to "Save" or "Download" the "Link" or "Target." Save file to your intended local folder.

October 2, 2006

Robert has made the following clips available for download:
entrance.mov | gurney.mov | phonecall.mov | resuscitation.mov

Right-click (Win), or Ctrl-click or click-and-hold (Mac) on the "Download File" links to find command closest to "Save" or "Download" the "Link" or "Target." Save file to your intended local folder.

June 12, 2006

Note
        Forterra's portion of this project is concluded. Forterra weekly reports will cease.
        Forterra's academic partners still have ongoing work.

Recently Completed
        Test & Evaluation event at Redwood High School on May 9, 2006

Redwood High School
Watch a video of the session here: Quicktime Clip1 | Clip2 | Clip 3


        Test & Evaluation at Swedish Schools from mid-May to June 9, 2006
        SUMMIT preliminary report completed.

In Progress
        Forterra
                No development work still in progress.
                Software completed (OLIVE version 0.7).
        Forterra-SUMMIT
                Contract still in progress.
                SUMMIT final report in preparation.
        Swedish Partners
                All testing completed.
                Swedish preliminary and final report status unknown.

Major Milestones
DONE            Project Proposals and Pre-Production
(late)          Contract (1/4/06)
DONE            Deliverables & Specification: Software Outline v6.1 (1/13/06)
DONE            Operational build: Beta version available for team testing (4/17/06)
DONE            LeRoy Heinrichs demo in Oklahoma
DONE            Environment ready for High School Student testing and evaluation
DONE            Setup for Evaluation Event at Redwood High School
DONE            Evaluation Event at Redwood High School
DONE            Evaluation Events in Sweden
Aug 31, '06     Submission of final papers and reports

 

May 22, 2006

Warning
        Swedish tests and evaluations ongoing on Forterra-2 server on May 22, 23, 24,29.
        Please leave this server to them between midnight and 8am Pacific time.

Recently Completed
        Test & Evaluation event at Redwood High School on May 9, 2006
        Initial Test at Swedish High School on May 18th, 2006

In Progress
        Forterra
                Change-over from Beta to Final Release for Olive 0.7
                        Final Release version will be on Servers Forterra-1
                        Beta version is being maintained on Server Forterra-2
                Supporting Swedish team in their test & evaluation events
                        These continue this week (22, 23, 24) and next week (29).
        Forterra-SUMMIT
                Contractual arrangements appear to await only the signing.
        Swedish Partners
                Worked with Forterra last week on rehearsals and trials.
                Planning test & evaluation sessions with various students on 22, 23, 24 and 29.
                Swedes continue to use Beta version (5/5/06) on Forterra-2,
                        transition to Final Release for Olive 0.7 to be coordinated later this week

Major Milestones
DONE            Project Proposals and Pre-Production
(late)          Contract (1/4/06)
DONE            Deliverables & Specification: Software Outline v6.1 (1/13/06)
DONE            Operational build: Beta version available for team testing (4/17/06)
DONE            LeRoy Heinrichs demo in Oklahoma
DONE            Environment ready for High School Student testing and evaluation
DONE            Setup for Evaluation Event at Redwood High School
DONE            Evaluation Event at Redwood High School
May 18-29, '06  Evaluation Event(s) in Sweden
Aug 31, '06     Submission of final papers and reports

May 15, 2006

Recently Completed
        Test & Evaluation event at Redwood High School
                Event was completed very successfully on May 9, 2006.
                Stanford University team collected a great deal of useful data.
                OLIVE 0.7beta3 performed without any crashes or major problems.

In Progress
        Forterra
                Supporting Swedish team in their test & evaluation events
                        These are happening this week and next week.
        Forterra-SUMMIT
                Contractual arrangements appear to await only the signing.
        Swedish Partners
                Working through dress rehersal issues with Forterra.
                Schedule of actual testing expected sometime May 17-19, 22-24.
                Swedish team will use same version of software as that used in USA.

Major Milestones
DONE            Project Proposals and Pre-Production
(late)          Contract (1/4/06)
DONE            Deliverables & Specification: Software Outline v6.1 (1/13/06)
DONE            Operational build: Beta version available for team testing (4/17/06)
DONE            LeRoy Heinrichs demo in Oklahoma
DONE            Environment ready for High School Student testing and evaluation
DONE            Setup for Evaluation Event at Redwood High School
DONE            Evaluation Event at Redwood High School
May 17-24, '06  Evaluation Event(s) in Sweden
Aug 31, '06     Submission of final papers and reports

May 8, 2006

Important
        Please refrain from accessing Forterra's Olive 0.7 servers on May 8 or May 9 unless you have a direct and assigned role in the Redwood High School event. If in doubt, please check with Pat Youngblood, Laura Kusumoto or Arnold Hendrick about your role. Casual people wandering in, or trying to observe, could compromise the entire event.

Recently Completed
        Olive v0.7 beta update deployed late on 5-5-06
                This update is available only to SUMMIT for US WGLN event on 5/8 and 5/9.
                Thereafter, all relevant Forterra customers will have access to it.

In Progress
        Forterra
                Have already deployed final version of v0.7 beta to support WGLN project.
                Supporting SUMMIT event (see below).
        Forterra-SUMMIT
                Forterra and SUMMIT will set up equipment at Redwood HS today, 5/8
                SUMMIT, supported by Forterra, will run event at Redwood HS tomorrow, 5/9
                Contractual arrangements very close, but still not yet finished.
        Swedish Partners
                Preliminary tests last week
                Will provide Swedish access to latest version starting May 10, 2006
                Looking forward to learning Swedish testing schedule.

Major Milestones
DONE            Project Proposals and Pre-Production
(late)          Contract (1/4/06)
DONE            Deliverables & Specification: Software Outline v6.1 (1/13/06)
DONE            Operational build: Beta version available for team testing (4/17/06)
DONE            LeRoy Heinrichs demo in Oklahoma
DONE            Environment ready for High School Student testing and evaluation
May 8, '06      Setup for Evaluation Event at Redwood High School
May 9, '06      Evaluation Event at Redwood High School
May ?, '06      Evaluation Event(s) in Sweden
Aug 31, '06     Submission of final papers and reports

May 1, 2006

Recently Completed
        Olive v0.7 beta deployed last week.
        Password protection added to Olive 0.7 beta last Friday (4/28/06)
                Anyway who wishes to access 0.7, write me for account name and password
                (me = ahendrick@forterrainc.com)

In Progress
        Forterra
                Supporting Swedish trial runs on May 3rd with current Olive 0.7 beta.
                Next Olive 0.7 expected to deploy on May 4 or 5.
                        All potential users will be notified by email when this version arrives
        Forterra-SUMMIT
                Redwood High School event plans in place for May 8th and 9th.
                Contractual arrangements continue moving forward, but not yet finished.
        Swedish Partners
                Preliminary tests involving just Swedish investigators on May 3rd.
                Sweden will schedule their main event based on results of this test.

               
Major Milestones
DONE            Project Proposals and Pre-Production
(late)          Contract (1/4/06)
DONE            Deliverables & Specification: Software Outline v6.1 (1/13/06)
DONE            Operational build: Beta version available for team testing (4/17/06)
DONE            LeRoy Heinrichs demo in Oklahoma
May 5, '06      Environment ready for High School Student testing and evaluation
May 8, '06      Setup for Evaluation Event at Redwood High School
May 9, '06      Evaluation Event at Redwood High School
Aug 31, '06     Submission of final papers and reports

April 24, 2006

Recently Completed
        Olive v0.7 beta deployed last week.
        University of Oklahoma demonstration was a great success
                (LeRoy Heinrichs and the whole team were GREAT dealing with beta software)

In Progress
        Forterra
                Improving Olive v0.7 - new version to be deployed sometime this week.
                Release version of Olive v0.7 will be compiled early next week.
        Forterra-SUMMIT
                Bug reports on Olive v0.7 beta would be appreciated.this week, earlier is better.
                Final coordination of May 8th-9th event at Redwood High School.
                Contractual arrangements moving forward, but still need attention.
        Swedish Partners
                Bug reports on Olive v0.7 beta would be appreciated this week, earlier is better.
                Need date for evaluation event in Sweden.
                Swedish partners are invited to download and experiment with the new version.

               
Major Milestones
DONE            Project Proposals and Pre-Production
(late)          Contract (1/4/06)
DONE            Deliverables & Specification: Software Outline v6.1 (1/13/06)
DONE            Operational build: Beta version available for team testing (4/17/06)
DONE            LeRoy Heinrichs demo in Oklahoma
May 5, '06      Environment ready for High School Student testing and evaluation
May 8, '06      Setup for Evaluation Event at Redwood High School
May 9, '06      Evaluation Event at Redwood High School
Aug 31, '06     Submission of final papers and reports

APRIL 18, 2006

MAJOR GOAL ACHIEVED

THE SIMERGENCY I CPR TRAINING SYSTEM TESTED WITH MULTI-PLAYERS.  In rehearsal for the beta demonstration at the University of Oklahoma HEalth Sciences Center and OU-Tulsa on April 21st, role-playing physicians were quickly able to use OLIVE v.07 with the virtual high school classroom to demonstrate  the proper procedure.

LeRoy's Avatar

Watch a video of the Demo Here: Quicktime | Windows Media

Right-click (Win), or Ctrl-click or click-and-hold (Mac) on the "Download File" links to find command closest to "Save" or "Download" the "Link" or "Target." Save file to your intended local folder.

April 17, 2006

Recently Completed
        First Olive v0.07 beta deployed today (Monday) to servers and websites
                Warning: beta versions are for testing only, they have known bugs.
        Email will go out describing:
                where to go for downloading the new version
                where to go for downloading the new manual (may keys have changed)
                which server to use for log-in: this will be a special Beta server
                your name and password to enter that server

In Progress
        Forterra
                Olive v0.07 beta is being deployed today (Monday)
                This beta does include CPR procedures and animations.!!!
                Many keys have changed, please check the manual (RTFM)
                Periodic updates of the beta WILL occur every few days.
                        Each update will be accompanied by an email about the new version.
                        Once a new version is released, you must update before you can log in.
                This first beta has quite a few known problems. Most significant are:
                        Sounds are missing (not integrated yet)
                        Teleport locations are missing from the dialog list, and/or have bugs.
                        A host of smaller problems.
        Forterra-SUMMIT
                Working to coordinate the Oklahoma demo this week.
        Swedish Partners
                Still need to set up date for evaluation event in Sweden.
                Swedish partners are invited to download and experiment with the new version.
                Swedish partners are warned that Apr 21-22 is reserved for SUMMIT use
                        (the Oklahoma demo)
               
Major Milestones
DONE            Project Proposals and Pre-Production
(late)          Contract (1/4/06)
DONE            Deliverables & Specification: Software Outline v6.1 (1/13/06)
DONE            Operational build: Beta version available for team testing (4/17/06)
April 21-22, '06        LeRoy Heinrichs demo in Oklahoma
May 1 '06       Environment ready for High School Student testing and evaluation
May 8, '06      Setup for Evaluation Event at Redwood High School
May 9, '06      Evaluation Event at Redwood High School
Aug 31, '06     Submission of final papers and reports

April 10, 2006

Recently Completed
        No changes from previous report

In Progress
        Forterra
                New code is being integrated with existing Olive as debugging continues
                Integrated art and sound assets being debugged
                New user interface being debugged
                Olive v0.07 Beta (client and server) expected when debugged
                        Hopefully debugging and deployment can finish this week
        Forterra-SUMMIT
                Follow-on grant application was sent last week.
        Swedish Partners
                Need to set up date for evaluation event in Sweden.
               
Major Milestones
DONE            Project Proposals and Pre-Production
(late)          Contract (1/4/06)
DONE            Deliverables & Specification: Software Outline v6.1 (1/13/06)
(early Apr '06) Operational build: Beta version available for team testing
April 21, '06   LeRoy Heinrichs demo in Oklahoma
May 1 '06       Environment ready for High School Student testing and evaluation
May 8, '06      Setup for Evaluation Event at Redwood High School
May 9, '06      Evaluation Event at Redwood High School
Aug 31, '06     Submission of final papers and reports

April 03, 2006

Recently Completed
        No changes from previous report

In Progress
        Forterra
                Engineering work nearly done, most code now in testing.
                Assets ready for integration with engineering work, first tests.
                Olive user interface code starting tests today.
                Sound assets revised, ready for integration.
                Integrated beta for SUMMIT testing now anticipated for week of Apr 10th
        Forterra-SUMMIT
                Follow-on grant application being pushed through at SUMMIT
        Swedish Partners
                Need to set up date for evaluation event in Sweden
               
Major Milestones
DONE            Project Proposals and Pre-Production
(late)            Contract (1/4/06)
DONE            Deliverables & Specification: Software Outline v6.1 (1/13/06)
(early Apr '06) Operational build: Beta version available for team testing
April 21, '06   LeRoy Heinrichs demo in Oklahoma
May 1 '06       Environment ready for High School Student testing and evaluation
May 8, '06      Setup for Evaluation Event at Redwood High School
May 9, '06      Evaluation Event at Redwood High School
Aug 31, '06     Submission of final papers and reports

March 27, 2006

Recently Completed
        Olive tested and works on computer setup at Swedish High School.
        Olive tested and works on computer network at American High School.

In Progress
        Forterra
                New Olive client this week (has updates unrelated to this project)
                Debugging animation routines, continuing coding of user interface.
                Art asset creation complete, need integration and testing inside Olive
                Forterra compressing milestones: early operational build IS the beta version
                Sound asset first round development received, second round in progress.
        Forterra-SUMMIT
                SUMMIT and Kim Hansen-Guzman planning evaluation event at RHS for 5/9/06
                Forterra-SUMMIT contract still in the works
        Swedish Partners
                Set up date for evaluation event in Sweden
               
Major Milestones
DONE            Project Proposals and Pre-Production
(late)          Contract (1/4/06)
DONE            Deliverables & Specification: Software Outline v6.1 (1/13/06)
(early Apr '06) Operational build: Beta version available for team testing
April 21, '06   LeRoy Heinrichs demo in Oklahoma
May 1 '06       Environment ready for High School Student testing and evaluation
May 8, '06      Setup for Evaluation Event at Redwood High School
May 9, '06      Evaluation Event at Redwood High School
Aug 31, '06     Submission of final papers and reports

March 20, 2006

Recently Completed
        Olive tested and works on computer setup at Swedish High School.
        Olive tested and works on computer network at American High School.

In Progress
        Forterra
                Engineering work continues on WGLN features for Olive
                Development of art assets continues, esp. teenage faces and animations.
                Sound asset development in progress.
        Forterra-SUMMIT
                Forterra is supporting SUMMIT's work on long-term planning for this project.
                Forterra-SUMMIT contract still in the works.
        Swedish Partners
                (Nothing needed this week)
               
Major Milestones
DONE            Project Proposals and Pre-Production
(late)          Contract (1/4/06)
DONE            Deliverables & Specification: Software Outline v6.1 (1/13/06)
(late March '06)        Early Operational Build - Forterra Internal Milestone
(early April '06)       Environment for ready for internal testing
April 21, '06   LeRoy Heinrichs demo in Oklahoma
(May 1 '06)     Environment ready for High School Student testing and evaluation
( - )           Completion of High School Student testing and evaluation
Aug 31, '06     Submission of final papers and reports

March 13, 2006

Recently Completed
        Initial Connectivity established with Swedish High School computers via internet

In Progress
        Forterra
                Engineering work for 3D integration now in progress
                3D art and animation adjustment expected late this month
                Sound asset development starting.
        Forterra-SUMMIT
                Arnold will do Olive connectivity tests at Redwood HS on Wed, 1:40pm
                Meeting re this project at Forterra, Thursday afternoon, 2:30pm
                        note: Pat Youngblood hopes to present her evaluation plan
                Contract still in the works.
        Swedish Partners
                Further tests on Swedish High School client hardware
                        working on solutions to technical issues re. voice and keyboard
               
Major Milestones
DONE            Project Proposals and Pre-Production
(late)          Contract (1/4/06)
DONE            Deliverables & Specification: Software Outline v6.1 (1/13/06)
(late March '06)        Early Operational Build - Forterra Internal Milestone
(early April '06)       Environment for ready for internal testing
April 21, '06   LeRoy Heinrichs demo in Oklahoma
(May 1 '06)     Environment ready for High School Student testing and evaluation
( - )           Completion of High School Student testing and evaluation
Aug 31, '06     Submission of final papers and reports

March 6, 2006

Recently Completed
        Olive successfully installed on new PC at Swedish H.S.
        Swedish H.S. PC successfully connected to Olive server in the USA
        Kim Hansen (with Cammy Huang) presented games and simulations
                at California Association of Bilingual Educators on Mar 2.

In Progress
        Forterra
                Engineering work for 3D integration scheduled - will occur in March
                3D art and animation adjustment (to fit with Engineering) expected in March
                Sound asset development starting.
        Forterra-SUMMIT
                Working on meeting plans for next week (Mar 13-17);
                        will advise once I get Forterra schedules straightened out
                Contract still in the works due to higher priority contracts now in progress
        Swedish Partners
                Further tests on Swedish High School client hardware being scheduled.

Major Milestones
DONE            Project Proposals and Pre-Production
(late)          Contract (1/4/06)
DONE            Deliverables & Specification: Software Outline v6.1 (1/13/06)
(late March '06)        Early Operational Build - Forterra Internal Milestone
(early April '06)       Environment for ready for internal testing
April 21, '06   LeRoy Heinrichs demo in Oklahoma
(May 1 '06)     Environment ready for High School Student testing and evaluation
( - )           Completion of High School Student testing and evaluation
Aug 31, '06     Submission of final papers and reports

Feb 27, 2006

Recently Completed
        Forterra 3D sent screenshots provided to entire team.
        Olive successfully installed on new PC at Swedish H.S. - yay!
        Swedish H.S. PC successfully connected to Olive server in the USA - yay!

In Progress
        Forterra
                3D setting created, still needs debugging and installation into Olive
                Animations created, but need installation into Olive and debugging
                Expecting schedule from engineering this week
                        This will determine timetable for integrating artwork into Olive
        Forterra-SUMMIT
                Kim Hansen (with Cammy Huang) will present games and simulations
                        at California Association of Bilingual Educators on Mar 2.
                Contract still in the works due to higher priority contracts now in progress
        Swedish Partners
                Further tests next week (this week is vacation at the Swedish H.S.)

Major Milestones
DONE            Project Proposals and Pre-Production
(late)          Contract (1/4/06)
DONE            Deliverables & Specification: Software Outline v6.1 (1/13/06)
(late March '06)        Early Operational Build - Forterra Internal Milestone
(early April '06)       Environment for ready for internal testing
April 21, '06   LeRoy Heinrichs demo in Oklahoma
(May 1 '06)     Environment ready for High School Student testing and evaluation
( - )           Completion of High School Student testing and evaluation
Aug 31, '06     Submission of final papers and reports

Feb 13, 2006
 
Recently Completed
            Swedish partner visits to Forterra and SUMMIT (1/18-30/06)
            Forterra-SUMMIT Status Meeting on Feb 2, '06 (at SUMMIT)
 
In Progress
            Forterra
                        High School environment
                        High School student avatars
                        Forterra early operational builds not expected until late March
            Forterra-SUMMIT
                        Finalizing hardware plan for testing at Redwood High School
                        Working on SUMMIT contract to Forterra for this work
            Swedish Partners
                        Performing Olive installs for hardware trials at Swedish sites
                        Investigating Swedish CPR procedures
 
Major Milestones
DONE               Project Proposals and Pre-Production
(late)                 Contract (1/4/06)
DONE               Deliverables & Specification: Software Outline v6.1 (1/13/06)
(late March '06) Early Operational Build - Forterra Internal Milestone
(early April '06)  Environment for ready for internal testing
April 21, '06       LeRoy Heinrichs demo in Oklahoma
(May 1 '06)       Environment ready for High School Student testing and evaluation
( - )                  Completion of High School Student testing and evaluation
( - )                  Submission of final papers and reports

Copyright 2006 SUMMIT - Stanford University School of Medicine